Topping out, topping up –

– of the additional classroom for the new 7th grade. Check out the substantial rebar content. And topping up? We have met our goal for “uniforms: outfit a kid for school”, the summer campaign. Thank you to our loyal and ever generous donors. Mesi ampil

building for the 7me

Three weeks to go. St Matthew’s is adding a 7th grade for the 2022-23 school year. A classroom is rising, it will be ready, on the top of the 2016 structure which was built with this expectation in mind. Thanks to all donors.

Remise de carnets-report cards

Parents gather in the new library/refectory to receive report cards from Pr Walin. Haitians are intensely engaged with the education of their children and historically have devoted a high proportion of income to education despite grinding poverty.